X
Looking forward to your contact us, we will provide you with professional services.
Contact Us
Environmental protection policy
1. Basic information
Company name: Chuanglong Industrial (Shenzhen) Co., LTD
Organization code :91440300618896646L
Legal representative: Wu Jingyi
Established: July 1996
Environmental protection investment: 2.66 million yuan
Production address: Shenzhen Baoan Shajing Republic third Industrial Zone F Zone 2
Contact us: 0755-27232890
Nature of Unit: Wholly foreign-owned (Hong Kong invested)
Industry Type: Industrial (electroplating or metal surface treatment)
Main products and scale: Mainly for watches, jewelry, glasses and electronic products and other manufacturers, providing traditional electroplating and vacuum electroplating and other metal surface treatment services, processed products sell well at home and abroad. So far, the company has a complete set of processing equipment and management system; Has more than 1,000 employees, including a group of excellent engineers and technical workers; Plant area of more than 30,000 square meters.
Production, operation and management services: Company philosophy: to provide each customer with the most reliable quality and specifications; The fastest delivery time; The best service and the most competitive price.
Business scope: Engaged in watch cases, watch bands, jewelry, spectacle frames, glasses, crafts, mobile phone accessories, electronic parts and other daily hardware products listening electroplating and processing business We firmly believe that with its dedicated staff, superior quality and good reputation, Chuanglong will further enhance its position in the industry.
2. Pollutant discharge information
1. Water pollutants
Wastewater treatment facility capacity: 250 tons/day
Daily wastewater discharge limit: 175 tons/day
Discharge destination (name of receiving water body) : wastewater station integrated Suwon tank, sewage treatment plant
Wastewater discharge implementation standards: Wastewater pollutants shall comply with the Pearl River Delta water pollutant discharge limits specified in Table 1 of DB44/1597-2015
Discharge port number: A class of pollutant nickel discharge port DW004, total discharge port DW003
Name of major pollutants and emission concentration limit (mg/L) : total nickel 0.5, PH 6 ~ 9, suspended matter 30, COD80, total copper 0.5, ammonia nitrogen 15, total cyanide 0.2, total phosphorus 1.0
2. Atmospheric pollutants
Exhaust gas emission implementation standard: GB21900-2008 Table 5 standard:, DB44/27-2001
Name of major pollutants and emission concentration limit (mg/m3) : nitrogen oxides 200.0, fluoride 7.0, cyanide 0.5, sulfuric acid fog 30.0, chromic acid fog 0.05, hydrogen chloride 30.0, total non-methane hydrocarbon 120.0
3. Construction and operation of pollution prevention facilities
The company's environmental management mechanism is complete, the environmental management system is complete, especially strengthen the solid waste and waste gas management system, as well as the improvement of the environmental emergency plan management mechanism, the implementation of the system is also in place, the operator can operate in accordance with the requirements of the environmental protection department and the company. Personnel supervision is relatively in place, and all sewage treatment is discharged up to standard, in line with environmental protection requirements. The company's environmental management level is good, attaches great importance to environmental protection! Over the years, has been actively involved in various environmental protection actions, and for many years won the "Pengcheng waste Reduction" action advanced enterprises; "Guangdong Province cleaner production secondary standard". Through cleaner production and participation in Pengcheng waste reduction action, our environmental management level has been improved, product quality and work efficiency have been improved, while saving resources and reducing operating costs, which can be described as multiple birds with one stone. In the future, we will continue to work hard! Strengthen management! Protect the environment! Make our process, products and services more green!
4. Environmental impact assessment of construction projects and other administrative permits for environmental protection
1, the name of the administrative license document: "Chuanglong Industrial (Shenzhen) Co., LTD. Construction project Environmental impact Review approval" (Shenhuan batch [2002] 20503) - Shenzhen Environmental Protection Bureau May 3, 2002.
Main content: Chuanglong Industrial (Shenzhen) Co., Ltd. applied for relocation, and the production method was approved for environmental protection; The emission standards and limits have been clarified.
2, the name of the administrative license document: "Chuanglong Industrial (Shenzhen) Co., Ltd. construction project Environmental impact review approval" (deep ring [2007] No. 100951) - Shenzhen Environmental Protection Bureau August 4, 2007.
Main contents: Chuanglong Industrial (Shenzhen) Co., Ltd. applied for relocation extension, declared the production method to obtain environmental protection approval; Invalid (deep ring Lot [2002] No. 20503) reply; The emission standards and limits have been clarified.
3, the name of the administrative license document: "Chuanglong Industrial (Shenzhen) Co., LTD. Construction project Environmental impact review approval" (deep circular batch [2009] 100049) - Shenzhen Environmental Protection Bureau January 21, 2009.
Main contents: Chuanglong Industrial (Shenzhen) Co., Ltd. applied for relocation extension, declared the production method to obtain environmental protection approval; Nullified (deep ring Lot [2007] No. 100951) reply; The emission standards and limits have been clarified.
4, the name of the administrative license document: "Chuanglong Industrial (Shenzhen) Co., LTD. Construction project Environmental impact review approval" (Shenhuan batch [2010] 100114) - Shenzhen Environmental Protection Bureau February 9, 2010.
Main contents: Chuanglong Industrial (Shenzhen) Co., Ltd. applied for expansion and increase of business projects to obtain environmental protection approval; Clarify the company's increased project emission standards and limits.
5, administrative license document name: "Chuanglong Industrial (Shenzhen) Co., LTD. Wastewater treatment renovation project acceptance decision" (Shenren Environmental Supervision [2011] No. 314) - Shenzhen Environmental Protection Bureau November 4, 2011.
Main content: Agreed to Chuanglong Industrial (Shenzhen) Co., Ltd. industrial wastewater treatment facilities renovation project officially put into use and put forward relevant environmental requirements.
6, the name of the administrative license document: "Chuanglong Industrial (Shenzhen) Co., Ltd. a class of pollutants separate discharge outlet acceptance decision" (Shenren Environmental Supervision [2014] 62) - Shenzhen Environmental Protection Bureau September 9, 2014.
Main content: A class of pollutants separate discharge port acceptance and put forward the relevant environmental requirements.
5.Emergency plan for environmental emergencies
1. "Chuanglong Industrial (Shenzhen) Co., LTD. Emergency Plan for Environmental Emergencies", which was reviewed and approved by experts on December 23, 2016, and submitted to Shenzhen Environmental Supervision Detachment for the record, has been promulgated and implemented.
2. "Chuanglong Industrial (Shenzhen) Co., Ltd. Emergency Plan for Environmental Emergencies", reviewed by experts, passed on May 18, 2020, and reported to Shenzhen Environmental Supervision Detachment for the record, has been promulgated and implemented.
3. "Chuanglong Industrial (Shenzhen) Co., Ltd. emergency Plan for environmental Emergencies », reviewed by experts, passed on June 2, 2023, and reported to Shenzhen Bureau of Ecological Environment for the record, has been promulgated and implemented.
6. Relevant data of soil testing
1. Completed the "2019 Soil and Groundwater Quality Status Monitoring Report", "2019 Soil and Groundwater Quality Status Monitoring Plan" and "Soil Pollution Potential Investigation Report".
2. Completed the "2020 Annual Soil and Groundwater Quality Status Monitoring Report", "2020 Annual Soil and Groundwater Quality Status Monitoring Plan" and "Soil Pollution Potential Investigation Report".
3. Soil testing in 2021, 2022 and 2023 has been completed
7. Hazardous waste and general solid waste related information:
The filing work related to hazardous waste and general solid waste in 2020, 2021, 2022 and 2023 has been completed, and everything is running normally at present.
Creasian Industrial Co., Ltd All rights reserved Sitemap Technical support:bpvis